Dear Member
Since our last report a couple of months ago I’m sure you’ll agree we have suffered from some very wet and cold weather conditions.
Greens
The greens are very healthy for this time of year, our aeration programme is ongoing to help the drainage and air circulation of the greens. We have also topdressed the greens with 30 tonnes of sand over the last few months.
Tees
The summer tees are recovering well from their winter rest. As the weather improves the cutting regime of these will intensify.
Winter Programme 4th & 18th works shown below as recommended at AGM
The bunker on the 8th fairway has been filled and turfed over and a new bunker has been made to the right hand side of it.
The hump on the 13th fairway has been removed and turfed over. The fairway bunker on the 4th has been filled in and two new bunkers have been made to the right hand side of the fairway.  Also on the 4th the bunker on the right, up beside the green has been filled in and a new one created closer to the green. The two fairway bunkers at the 18th will also be filled in and a new bunker will be created at the left hand side of the fairway at 150m from the green.
The outstanding projects will be completed within the next month.
Steven Dunn
Head Greenkeeper
4th New Bunkers
18th New & Old Bunkers